WELCOME TO OUR COMPANY
Guinzy Construction performed the earthwork, storm sewer, concrete work, structural steel work, siding, and other general work on a xxx sf addition to the mixer building in 2013. The building consisted of a 14 ft. deep basement with a 42 inch thick foundation floor, two 24 inch thick concrete mezzanines and 3 stories of structural steel and elevated concrete slabs.

Copyright © 2017  by "Guinzy Construction, Inc."  ·  All Rights reserved  ·  E-Mail: gci@guinzyconstruction.com
Home

Our Company

What We Do

Previous Projects

Certifications

Contact