WELCOME TO OUR COMPANY
Guinzy Construction performed the earthwork, storm sewer, concrete work, structural steel work, siding, and other general work on a xxx sf addition to the mixer building in 2013. The building consisted of a 14 ft. deep basement with a 42 inch thick foundation floor, two 24 inch thick concrete mezzanines and 3 stories of structural steel and elevated concrete slabs.
Copyright © 2017 by "Guinzy Construction, Inc." · All Rights reserved · E-Mail: gci@guinzyconstruction.com